Service project

Wall cleaning

Wall cleaning

For using equipment of security, standard also made has express, as new building, on buildings, and structures height over 40 meters Shi, should priority set meet cleaning, and maintenance of wipe window machine; second to selection high at job hanging basket for cleaning, and maintenance job; in by buildings structure limit, outside wall cleaning cannot using hanging equipment Shi, must implementation about security technology measures, by construction Enterprise responsibility people signed Hou, only can using after security technology test institutions test qualified of big rope hanging Board or hanging device job,. In addition to personnel safety, standard also provides building, structure, façade of glass curtain wall and cleaned at least once a year; the exterior stones and spray material viscosity of granitic plaster, dry, whitewashed once should be cleaned on a regular basis and at least every 5 years outside walls in the cleaning process, should not cause secondary pollution to the environment. Sand spray should be used wet, sand be recycled.
Spider-man is the difficulty of the cleaning, the risk is big, but is also a well-paid business projects, a tall, she does not clean is not only do the cleaning work in a timely manner in order to avoid or reduce damage wall surfaces. Therefore, we need to Spider-man, cleaning exterior walls or glass curtain wall for a special presentation.
a
, outer wall cleans way at present outer wall clean mainly has two ways: the hanger plate way and window cleaning.
the hanger plate way is to use wire, hanger plate to hang people to the working position for cleaning. This is relatively simple, low cost, as long as the worker physical quality good, the rope firmly attached to general building cleaning can be used this way, but this kind of operation safety measures must be in place, otherwise the risk is greater, causing casualties are caused by the security measures are not in place.
II
1, cleaning facades cleaning conditions, climatic conditions: the outer wall clean must be performed in good weather conditions, wind turbines should be less than level 5, level 5 stopped working. Therefore, the work should be determined before the wind, especially in high wind. In addition, rain, snow, fog, poor visibility and high temperature (more than 35 ℃) and low temperature (below 5 c) under such conditions are not suitable for wall cleaning.
2. Conditions: in order to carry out national security regulations to ensure worker safety and normal operation of equipment, provides air operator must be 18 years of age for male citizens, and after a medical examination and security training, qualified jobs, workers shall not drink beforehand, have physical symptoms such as colds suspended Spider-man.
3, equipment conditions: external cleaning of equipment must be in good working condition, where the hanger plate has creepy phenomena such as, part of the strands should be immediately replaced with new ropes.
III, the outer wall clean safety procedures
l, must be carefully inspected before working machinery and equipment, gear, rope, thwart, seat belts for damage, carpet cleaning in Shanghai to ensure good mechanical properties and appliances free of abnormal operation. Operation
2, ropes, safety ropes must be separated from root and tied to death, relying on narrow necked to pad a soft, to prevent wear and rope, rope end must have contact with the ground, ropes were also to temporary safety ropes.
3, construction induction before put on overalls, wearing a helmet, induction when the first seat belt lock (safety rope) and then fasten the shackles (action line), while buttons to tight, solid die.
4, when you clean the rope, head upstairs and the construction supervisor to give direction and help. When you
5, assistive devices to be tightly fastened. In case of wounding, slapstick and no laughing and carrying other unrelated articles;
6, upstairs, the ground guardianship personnel to stand firm on the construction site. Effectively perform their duties. Always observe the operating rope, safety rope tension and rope, the rope phenomenon, found that the problem reports in a timely manner, ruled out.
7, floor care workers are not free to walk back and forth on the edge of the roof. When needed, you must fasten their safety rope, then aided work. The ground guardianship personnel shall not be read on the construction site, but not free to watch other scenes. And to stop pedestrians from entering dangerous areas and cord, throw rope phenomenon occurrence.
8, rope, safety rope required shift operation, when the upper and lower, care workers and ancillary workers have to coordinate together in place when not lay the rope tied tightly.
9, cleaning the construction when it comes to landing, the first look at the floors, the walls of the facility, operation rope, safety rope localization and pedestrian traffic, pending the ground guardianship personnel, adjusted, approval slowly declined until ground.
10, to insist on safe and civilized construction, ensure quality of service.
11, is allowed to damage the customer's facilities.
12, the outer wall clean Spider-man staff and on-site monitoring personnel must obey the head of construction of unity of command and management.
BACK
Service project
map
CONTACT:
Shaoxing Perfect Cleaning Service Co.,Ltd
TEL:
0575-84111759
FAX:
13357562326
E-mail:
378194377@qq.com

© lincs-photography.com All Rights Reserved. E-mail: 378194377@qq.com